FGC:Episode 05 Cut 068: Difference between revisions

From EvaWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 16: Line 16:


{{FGC:Script Text|type=description
{{FGC:Script Text|type=description
|text=At the foot of the mountain (with a view of the humanoid), a temporary edifice is connected to prefabricated installations.  
|text=At the foot of the outline is a temporary installation made of prefabricated buildings. The Nerv logo, and warning signs like “Safety First” and “Wear Helmets” are written on boards.
The Nerv mark, Safety First, Wear Your Helmet, and other cautionary signs are about.  
  }}
  }}


Line 24: Line 23:


{{FGC:Script Text|type=regsupplemental|speaker=Female Announcer A (OFF - left)
{{FGC:Script Text|type=regsupplemental|speaker=Female Announcer A (OFF - left)
|text=“The Demolition of Block D-3 has been completed.}}
|text=The Demolition of Block D-3 is complete. }}


{{FGC:Script Text|type=supplemental51|speaker=
{{FGC:Script Text|type=supplemental51|speaker=

Revision as of 14:50, 11 April 2010


Screenshots Cut # Description/Dialogue Commentary

068

At the foot of the outline is a temporary installation made of prefabricated buildings. The Nerv logo, and warning signs like “Safety First” and “Wear Helmets” are written on boards.

Female Announcer A (OFF - left):“The Demolition of Block D-3 is complete.”

Reichu: There's a rough diagram of the installation in the econte.